10m Solar Panel progression bug (Identical to a closed bug from another user)

Elaisa shared this bug 26 hours ago
Submitted

I'm having the same bug reported by another user, with the same bug name. A contract on Palatine station requires a 10m solar panel that is supposedly unlocked on Vallis Reach, but despite being in the Colonized stage (I have done all contracts on Vallation and all unlock contracts on Palatine) the contract to unlock the 10m Solar Panel is unavailable.

Included save file on Vallis Reach

Leave a Comment
 
Attach a file