Stuck on the first of the 20% contracts

Brian Barnes shared this feedback 5 days ago
Not Enough Votes

I am stuck attempting to complete the first of the 20% contracts - fixing up the manufacturing facility. I repaired the cargo container, smelter, and assembler. I created the 12 heavy plates, and now, as you can see in the attached screen clip, I am supposed to use the smelter and assembler to create the listed stuff - but there isn't anything listed. Please advise.

bcbarnes (Brian)

Replies (6)

photo
3

RevelThane on the steam discussion board provided the solution. In addition to the 12 heavy plates, you need to craft 8 wire in the smelter. Put the wire into your inventory along with the 12 heavy plates, and the next step in the contract appears - fix the two batteries.

All is good.

photo
1

Thanks @ Brian!!

photo
1

I have the same problem. Only the 8 wires were displayed for me.

photo
1

Same problem. I've fixed the batteries and contract became compleeted.

photo
1

I erroneously just left this as a bug report as well before checking if other's had left this bug. Can confirm same bug. Wires are optional, fix the batteries worked for me.

photo
1

I think if you put inventory into the assembler/smelter while working, you also have to completely empty it out to progress. It could be more like taking two things out of the assembler finishes the quest.

Leave a Comment
 
Attach a file
You can't vote. Please authorize!