.5m Conveyors in LONG (2.5m) and half-lengths (1.25m) to cut down on PCU use
Not Enough Votes
Now that we have H2 THRUSTERS, all of which ONLY need the small (.5m) conveyors as they are only passing hydrogen, it is EXPENSIVE (PCU-wise) to pipe some locations on ships.
At 50 PCU per pop with the short lengths currently available (JUST the .5m in length....).....
...having straight .5m Conveyors - lengths such as 2.5m and 1.25m - would really cut down on PCU accumulations..........
You can't vote. Please authorize!
Replies have been locked on this page!