VS2.3, Nadirae contract "Engineering - Industrial Foothold": No holograms visible to weld
Not a Bug
Instead of holograms to weld I only see an empty green outline box. A bug or me not understanding the the mission at all.
Abandoned and re-accepted the mission to no avail.
I have the same bug
Hello Martin,
This is intended behavior. All Contracts have been reworked in the Vertical Slice 2.3. Engineering Contracts in particular are now requiring you to design and build the Grid based on given parameters. You are given the place to build it (the green outline box) and after fulfilling these parameters you are instructed to transfer the ownership of the Grid you just built in another location which then completes the Contract.
As this is intended behavior, I will close this thread as Not a Bug.
Kind Regards,
Bartosz
Keen Software House
Hello Martin,
This is intended behavior. All Contracts have been reworked in the Vertical Slice 2.3. Engineering Contracts in particular are now requiring you to design and build the Grid based on given parameters. You are given the place to build it (the green outline box) and after fulfilling these parameters you are instructed to transfer the ownership of the Grid you just built in another location which then completes the Contract.
As this is intended behavior, I will close this thread as Not a Bug.
Kind Regards,
Bartosz
Keen Software House
Replies have been locked on this page!